Spring 2015

 

We seem to have taken a bit of a break from construction over the winter.. well outside until mid March at any rate.

 

Early March saw a restart of track laying and another panel ready

IMG_1842a

 

16th March.  well a short discussion with a local building site and three dumper loads of earth arrived. just need to spread it out to make the 12″ high embankment.  The whole length is level so once we have the datum point where it comes back onto the drive we are off and running.

Embankment to be.

Embankment to be.

 

Half post edging

Half round post edging

4th/6th April Moss of Easter weekend was spent shifting Muck

Front Curve and embankment

Front Curve and embankment

 

IMG_1868a

Looking back up the 'Straight'

Looking back up the ‘Straight’