Spring 2015
We seem to have taken a bit of a break from construction over the winter.. well outside until mid March at any rate.
Early March saw a restart of track laying and another panel ready
16th March. well a short discussion with a local building site and three dumper loads of earth arrived. just need to spread it out to make the 12″ high embankment. The whole length is level so once we have the datum point where it comes back onto the drive we are off and running.
4th/6th April Moss of Easter weekend was spent shifting Muck